SV Cold Start Up

Client: Idemitsu 

Field: Sao Vang and Dai Nguyet 

Facilities: Condensate Pipeline from SV CPP to FSO; FWS Pipeline from DN WHP to SV CPP

Synergy's Scope of Work

Synergy was requested to study the cold start-up

Scope of Work include performing dynamic simulations for the cold well start-up of the SV platform to determine methanol dosing rate and minimum piping wall temperature and for the SV flowline depressurizing to determine cold metal temperature around blowdown valve.