Concept Select study for SF30 Waterflood

Client: Hibiscus Petroleum Berhad

Field: South Furious 30

Location: Malaysia

Synergy's Scope of Work 

Synergy was requested to inject between 15,000-29,000 bbdl/d of inhibited seawater into the SF30 filed through four water injector wells.

Scope of work includes to perform a concept study which to validate concept and review water injection equipment and conductor facilities.

Key Project Achievements 

1. Completed Concept Study as per Client Requirement within schedule.