SK310 B15 Dynamic Simulation Study

Client: SapuraKencana/ RNZ

Location:Malaysia 

Facilities: Production Separator 

Synergy's Scope of Work: 

To perform  dynamic simulation study for determining the process safety time (PST) to prevent over pressure by shutting SDV2010 at the inlet to the production separator, and to estimate the pressurization time within the topside system in the event a valve fails shut. 

Software: HYSYS

Year: 2014