SV PSV Dynamic Simulation Study

Client: Aker Engineering

Location:Vietnam

Facilities: Offshore Production Platform 

Synergy's Scope of Work: 

To study the impact of an over pressure scenario covering choke valve/wing valve collapse on the Test Separator and HP Separator over pressure protection system as well as to perform a slug load analysis (sudden rise in gas/liquid loading) due to a gas blow by scenario as a result of fully open liquid control valve.
Simulation on Sao Vang and Dai Nguyet Development Project.Figure 1:  Sao Vang and Dai Nguyet Development Project.

Software: HYSYS

Year: 2018